Lighthouse Electric | Penn State Hershey Data Center

Penn State Hershey Data Center

Hershey Medical Center

Scope: Design – Assist Construction of a New 2-story 2.5MW 55,000 Square foot Data Center

Lighthouse Electric was in Charge of BIM and led coordination among trades. Lighthouse added value to the owner by being a part of the design and fabrication team, for a seismic strut ceiling system. This system installa on added a cost savings along with additional future support options. This is part of a redundant data center with the Lighthouse constructed data center at the Penn State main campus in State College

  • Extension of the High Voltage duct bank for redundant feeds from substation.
  • Two, Medium Voltage Switches.
  • Two, 2500 KVA transformers.
  • Two, 2.5MW Generators.
  • Seventeen, Automatic Transfer Switches.
  • Seismic Strut Ceiling System (Value engineered / Design-assist and installation).
  • Power Distribution Unit (PDU) to computer room busway.
  • Power monitoring.
  • All Light fixtures and Energy Management Lighting Controls.
  • Branch and Emergency Power.
  • Fire Alarm and Very Early Smoke Detection Apparatus (VESDA) System.
  • Site Lighting.
  • All Data Network Cabling and Security rough-in.
  • Performed Testing.
  • Provided Level 5 commissioning support.

Constructed - 2016
CONSTRUCTION MANAGER
Holder Construction
ENGINEER
IDC Architects/Barton
OWNER
Penn State Milton S. Hershey Medical Center
ELECTRICAL CONTRACTOR
Lighthouse Electric Company, Inc.

Lighthouse Electric | Penn State Hershey Data Center
Conference Room
Lighthouse Electric | Penn State Hershey Data Center
Office Space
Lighthouse Electric | Penn State Hershey Data Center
Network Operations Center (NOC) / Security Operations Center (SOC)