Iron Mountain Data Center Phase 2A

Scope: Design – Assist Construction of a 80,000 Square Foot New Phase in a Co-Location facility

  • Lighthouse Electric was in Charge of BIM and led coordination among trades
  • Installed (3) 2000kW 2500kVA 4.16kV Cummins Generators inside of the mine with remote radiators topside.
  • Installed (1) 300kW 375kVA 480V Life Safety Cummins Generator topside.
  • Built two new services topside and extended down into the mine - 25kV to 4.16kV.
  • Installed UPS system made up of over 800 batteries and 9 PDUs.
  • Coordinated and installed Strut Support Ceiling.
  • Redundant power sources - Normal power (from new services), generator power, UPS power
  • NETA testing
  • Fire alarm - new system tied into existing.
  • Installed 80,000lb blockhouses for the new service.

 

GENERAL CONTRACTOR
Holder Construction

ENGINEER
KW Engineering

OWNER
Iron Mountain

Mine Entrance
Installing Cable Tray
Switch Gear
Generators